Lambda to CAN Dual Bosch 4.9 Sensors Long Leads
SKU: 61301L
£540.00Price
LTCD Bosch 4.9 (LONG) 600mm Sensor Looms
Lambda To CAN Dual module to suit the Bosch 4.9 Sensors
MoTeC's LTCD Bosch 4.9 (Lambda To CAN) is the dual Physical
sensor version of the LTC Bosch. It monitors, controlsand diagnoses two Bosch Lambda sensors, transmitting connectors
Lambda readings on a CAN bus. When using Dual LTCs
or a mix of singular and Dual LTCs, up to 32 Lambda
sensors can be configured on a single CAN bus forsimultaneous monitoring by an ECU or logging device.
Please NOTE price doesn’t include VAT and it will be added when the payment is made in PayPal
