Lambda to CAN Dual NTK Sensors Long Leads
SKU: 61305L
£540.00Price
LTCD NTK (LONG) 600mm Sensor Looms
Lambda To CAN Dual module to suit the NTK Sensors
MoTeC's LTCD NTK (Lambda To CAN) is the dual Physical
sensor version of the LTC NTK. It monitors, controlsand diagnoses two NTK Lambda sensors, transmitting connectors
Lambda readings on a CAN bus. When using Dual LTCs
or a mix of singular and Dual LTCs, up to 32 Lambda
sensors can be configured on a single CAN bus forsimultaneous monitoring by an ECU or logging device.
Please NOTE price doesn’t include VAT and it will be added when the payment is made in PayPal
